Preparing your sale
A site that must keep operating may need to sell and release surplus transformers in stages. Build a list of each unit, its nameplate rating, owner, location, known condition, and earliest realistic release window. Identify dependencies on replacement power or production work without promising a buyer that every unit will be ready at once.
What buyers need to know
Facility operations, qualified electrical personnel, and the project manager should agree on work boundaries and a change-control process for each phase. Remaining equipment may still be energized, so a removed or isolated asset must not be treated as evidence that the surrounding area is safe. Link each unit's maintenance, fluid, and PCB records to its serial number and disclose known faults or missing parts. In the sale agreement, state whether the buyer is purchasing a fixed list or only units released after each milestone, and specify how changes in timing or condition will be communicated. Clarify responsibility for temporary storage, site access, loading, and any equipment that remains on site.
Coordinate the handoff
Set separate approved pickup windows and a contact for each phase, with qualified riggers and an accepted freight plan for each load. Record the actual condition and transfer of every unit at handoff rather than relying on a single project-wide assumption.
Seller checklist
- Create a serial-number inventory with phase, availability, and applicable documentation.
- Confirm operational dependencies and qualified electrical release at each milestone.
- Agree on storage, loading, freight, changes, and individual handoff records in writing.